Unit 3 Matrix Park, Park Royal

Client Name: Segro PLC
CA: Arcadis London
Project Value: £470k

GLJ contracts Ltd were instructed to carry out the renovation of Unit 3 Matrix Park following the former tenants departure, The works taking place included the installation of a new PV System along with a new Roller Shutter Door and fire exit door installed in the Unit. EV chargers were also newly installed outside of the Unit. With this came new Line Marking, as seen above, to replace the faded spaces from before works began

A new kitchenette was also installed in the Unit replacing the now out of date one, Along with this, the flooring being replaced throughout the Unit with new Carpets being installed in the office areas, new vinyl flooring in the kitchenette & WC’s and epoxy coated flooring being installed in the warehouse area.

There were also upgrades to the Plumbing in the unit, With the WC’s being overhaled completely, the Electrics on site were also worked on, this included improvements to the lighting system in the building. Decorative works also took place in the building, with new painting being done throughout the unit

Below is the full list of services rendered at the property

Services:
• Strip Out Works
• New Kitchenette
• New Flooring Installations
• New Carpet Installations
• Installation of New PV System
• Installation of new VRV heating & cooling system
• Installation of a new roller shutter door and fire exit door
• Decoration Works Throughout
• Relocation of the WC’s to the first floor office along with replacements to the ground floor WC’s
• Installation of new EV chargers
• Works to the roof including a new roof coating
• Installation of a new fall arrest system
• Installation of new heat recovery units throughout offices